Cernavoda NPP Branch
Ensures the safe operation of Units 1 and 2, each with an installed capacity of 700 MWh. The two nuclear reactors from Cernavoda NPP ensures about 20% of Romania’s energy demand.
Cernavoda NPP uses Canadian CANDU 6 technology (Canadian Deuterium Uranium) with natural uranium as fuel and heavy water as moderator and cooling agent.
Cernavoda NPP Unit 1 was commissioned on December 2th, 1996 and Unit 2 on September 28th, 2007.